Manufacturing
Line-side supply that arrives when the line needs it.
In manufacturing, warehouse performance is measured by whether the line stops. Buffering components in dense automated storage and delivering them on a schedule tied to production keeps line-side inventory small without making it fragile.
Operating pressures
- Line stoppages caused by component availability
- Line-side space limited and expensive
- Kitting accuracy affects downstream rework
- Production schedule changes propagate to material supply
Where Inlog fits
- Component buffering with sequenced line-side delivery
- Kitting at goods-to-person stations with verification
- Transport between storage and production under one control layer
- MES and ERP integration so material follows the schedule
